Setup
On first use, read setup.md for integration guidelines. Create ~/home-renovation/ if it doesn't exist.
When to Use
User plans a home renovation or remodel. Agent tracks budgets, timelines, and contractor coordination. User needs help evaluating quotes, planning phases, or managing multiple trades.
Architecture
Memory lives in ~/home-renovation/. See memory-template.md for structure.
CODEBLOCK0
Quick Reference
| Topic | File |
|---|
| Setup guide | INLINECODE4 |
| Memory template |
memory-template.md |
| Project types |
projects.md |
| Contractor evaluation |
contractors.md |
| Renovation phases |
phases.md |
Core Rules
1. Project-Centric Memory
Each renovation gets its own file in
projects/. Track:
- - Budget: original estimate vs actual spend
- Timeline: planned vs actual dates
- Contractors: who, contact, status, notes
- Decisions: what was decided and why
2. Budget Reality Check
When user shares a quote or estimate:
- - Ask square footage and scope details
- Compare to typical ranges (see
projects.md) - Flag if significantly above/below normal
- Never guarantee prices — always "typically ranges from..."
3. Phase-Based Planning
Renovations follow a sequence. See
phases.md for details:
- 1. Planning & permits
- Demolition
- Structural/rough-in (electrical, plumbing, HVAC)
- Insulation & drywall
- Finishes (paint, flooring, fixtures)
- Final inspection & punch list
Wrong order = costly rework. Always verify sequence before starting.
4. Contractor Coordination
When multiple trades involved:
- - Confirm who handles permits
- Establish communication expectations
- Document verbal agreements immediately
- Track payment schedule vs work completed
5. Scope Creep Defense
Every change request:
- - Get written quote before approving
- Update budget tracker
- Recalculate remaining contingency after each approved change order
- Assess timeline impact
- Document decision and rationale
6. Decision Documentation
For every major decision, record:
- - What options were considered
- Why this option was chosen
- Cost and timeline impact
- Date decided
This prevents revisiting decisions and provides context for future projects.
7. Progress Updates
When user mentions progress:
- - Update project timeline
- Check if on budget
- Note any issues or delays
- Celebrate completed milestones
Common Traps
- - Paying too much upfront → Never more than 30% deposit. Balance tied to milestones.
- Verbal agreements → Get everything in writing. "They said" has no legal weight.
- Skipping permits → Insurance won't cover unpermitted work. Resale problems.
- Cheapest bid → Often means corners cut or change orders coming. Middle bid often safest.
- No contingency → Budget 15-20% extra. Something always comes up.
- Scope creep silence → Every "while we're at it..." adds cost. Track it.
- Wrong sequence → Painting before electrical = repaint. Plan phases correctly.
Cost Estimation Guidelines
These are rough ranges only. Always get local quotes.
| Project Type | Low | Mid | High | Notes |
|---|
| Kitchen remodel | $15K | $40K | $80K+ | Cabinets drive cost |
| Bathroom remodel |
$8K | $20K | $40K+ | Tile and fixtures vary |
| Flooring (per sqft) | $3 | $8 | $15+ | Material + labor |
| Roof replacement | $8K | $15K | $30K+ | Size and material |
| Window replacement (each) | $300 | $700 | $1,500+ | Standard vs custom |
| Deck/patio | $5K | $15K | $40K+ | Material matters |
| Painting interior | $2K | $5K | $10K+ | Size and prep work |
Cost multipliers:
- - HCOL area (SF, NYC, LA): 1.5-2x
- Historic home: 1.3-1.5x
- Expedited timeline: 1.2-1.5x
- Custom/high-end materials: 2-3x
Red Flags to Watch
Contractor warning signs:
- - Won't provide references
- Demands large deposit (>30%)
- No written contract
- Can start "tomorrow" (why are they free?)
- Much lower than other bids
- Pressures quick decision
- No insurance/license proof
- Won't pull permits
Project warning signs:
- - Budget already maxed before starting
- No contingency fund
- Timeline too aggressive
- Too many simultaneous projects
- Unclear scope document
Security & Privacy
Data that stays local:
- - Project details in INLINECODE12
- Contractor contact info you provide
- Budget and timeline tracking
This skill does NOT:
- - Access financial accounts
- Contact contractors directly
- Make purchases or payments
- Access files outside INLINECODE13
Related Skills
Install with
clawhub install <slug> if user confirms:
- -
money — Personal finance and budgeting - INLINECODE16 — General project tracking
- INLINECODE17 — Planning and goal setting
Feedback
- - If useful: INLINECODE18
- Stay updated: INLINECODE19
技能名称:家居装修
详细描述:
设置
首次使用时,请阅读 setup.md 了解集成指南。如果 ~/home-renovation/ 目录不存在,请创建该目录。
使用时机
用户计划进行家居装修或翻新。助手负责跟踪预算、时间表和承包商协调。用户需要帮助评估报价、规划阶段或管理多个工种。
架构
记忆存储在 ~/home-renovation/ 目录中。结构请参考 memory-template.md。
~/home-renovation/
├── memory.md # 状态 + 活跃项目概览
├── projects/ # 每个项目的详细信息和跟踪
│ └── {project}.md # 预算、时间表、承包商、备注
└── archive/ # 已完成的项目
快速参考
memory-template.md |
| 项目类型 | projects.md |
| 承包商评估 | contractors.md |
| 装修阶段 | phases.md |
核心规则
1. 以项目为中心的记忆
每个装修项目在 projects/ 目录下都有独立的文件。跟踪以下内容:
- - 预算:原始估算与实际支出
- 时间表:计划日期与实际日期
- 承包商:人员、联系方式、状态、备注
- 决策:决策内容及原因
2. 预算现实检查
当用户分享报价或估算时:
- - 询问面积和范围细节
- 与典型范围进行比较(参见 projects.md)
- 如果明显高于或低于正常水平,则标记
- 切勿保证价格——始终使用“通常范围在……”
3. 基于阶段的规划
装修遵循一定的顺序。详情请参见 phases.md:
- 1. 规划与许可
- 拆除
- 结构/粗装(电气、管道、暖通空调)
- 保温与干墙
- 饰面(油漆、地板、固定装置)
- 最终检查与整改清单
顺序错误 = 代价高昂的返工。开始前务必确认顺序。
4. 承包商协调
当涉及多个工种时:
- - 确认谁负责办理许可
- 建立沟通期望
- 立即记录口头协议
- 跟踪付款进度与已完成工作
5. 范围蔓延防御
每次变更请求:
- - 在批准前获取书面报价
- 更新预算跟踪器
- 每次批准的变更单后重新计算剩余应急资金
- 评估时间表影响
- 记录决策和理由
6. 决策记录
对于每个重大决策,记录:
- - 考虑了哪些选项
- 为什么选择此选项
- 成本和时间表影响
- 决策日期
这可以防止重复讨论决策,并为未来项目提供背景信息。
7. 进度更新
当用户提及进度时:
- - 更新项目时间表
- 检查是否在预算内
- 记录任何问题或延误
- 庆祝完成的里程碑
常见陷阱
- - 预付过多 → 首付不超过30%。余额与里程碑挂钩。
- 口头协议 → 所有内容都要书面记录。“他说过”没有法律效力。
- 跳过许可 → 保险不承保未经许可的工程。转售时会有问题。
- 最低报价 → 通常意味着偷工减料或后续变更单。中间报价通常最安全。
- 没有应急资金 → 预算额外预留15-20%。总会有意外情况。
- 范围蔓延沉默 → 每个“顺便……”都会增加成本。记录下来。
- 顺序错误 → 先刷漆后做电气工程 = 重新刷漆。正确规划阶段。
成本估算指南
这些仅为大致范围。务必获取当地报价。
| 项目类型 | 低 | 中 | 高 | 备注 |
|---|
| 厨房翻新 | 1.5万 | 4万 | 8万+ | 橱柜是主要成本 |
| 浴室翻新 |
8千 | 2万 | 4万+ | 瓷砖和固定装置差异大 |
| 地板(每平方英尺) | 3 | 8 | 15+ | 材料 + 人工 |
| 屋顶更换 | 8千 | 1.5万 | 3万+ | 面积和材料 |
| 窗户更换(每扇) | 300 | 700 | 1500+ | 标准 vs 定制 |
| 露台/庭院 | 5千 | 1.5万 | 4万+ | 材料很重要 |
| 室内油漆 | 2千 | 5千 | 1万+ | 面积和准备工作 |
成本乘数:
- - 高生活成本地区(旧金山、纽约、洛杉矶):1.5-2倍
- 历史建筑:1.3-1.5倍
- 加快时间表:1.2-1.5倍
- 定制/高端材料:2-3倍
需警惕的危险信号
承包商警示信号:
- - 不提供推荐人
- 要求高额定金(>30%)
- 没有书面合同
- 可以“明天”开工(为什么他们有空?)
- 报价远低于其他竞标者
- 催促快速决策
- 无法提供保险/执照证明
- 不愿办理许可
项目警示信号:
- - 开工前预算已用尽
- 没有应急资金
- 时间表过于激进
- 同时进行太多项目
- 范围文件不明确
安全与隐私
本地存储的数据:
- - ~/home-renovation/ 中的项目详情
- 您提供的承包商联系信息
- 预算和时间表跟踪
此技能不会:
- - 访问金融账户
- 直接联系承包商
- 进行购买或付款
- 访问 ~/home-renovation/ 之外的文件
相关技能
如果用户确认,使用 clawhub install
安装:
- - money — 个人理财与预算
- projects — 通用项目跟踪
- plan — 规划与目标设定
反馈
- - 如果有用:clawhub star home-renovation
- 保持更新:clawhub sync